Home | About Us | Contact us
 
Search
 
 
 
 

Construction

  • Construction of Banjara Bhavan at Dharwad
  • Construction of 100 No's workers Quarters (25Blocks, 1Block of 4 Quarters) at Hutti for Hutti Gold Mines Company Ltd
  • Construction of 143 houses for the flood displaced at Chintaman doddi, Raichur Dist for Sri Ramakrishna Ashram
  • Construction of Residential Houses on Turnkey basis in the Flood affected areas in Bellary District for Kariganur Mineral     Mining Industry (KMMI)
  • Construction of 1014 houses for flood relief victims in Lingasugur, Deodurga and Manvi Taluks of Raichur Dist for Hutti     Gold Mines Company Limited
  • Construction of Low Cost houses for flood relief in Achholli Village in Siruguppa Taluk, Bellary Dist for V S Lad & Sons     (VSL)
  • Dismantling / Demolition

  • Demolition / Dismantling of Partial / Full building structure identified in between Hosur circle at Hubballi to Tollnaka,     Dharwad for land acquisition for the construction on dedicated BRTS Corridor and mixed traffic lanes under H-D BRTS     Project at Hubli, Dharwad
  • Demolition / dismantling of Partial / Full Building structures identified in between Tollnaka to Jubilee circle in Dharwad City     for Land acquisition for the construction of dedicated BRTS corridor and mixed traffic lanes under H-D BRTS Project at     Hubli, Dharwad
  • Demolition Works of Mantri Centrium (Lalbagh), Bangalore
  • Demolition/ Dismantling of partial/full building/structures identified for Bangalore metro rail project” Bangalore
  • Dismantling of Existing RCC C-Boiler stack about 80 Mtr heights at FCC Unit, Indian Oil Corporation Limited, Mathura     Refinery
  • Engineered Emergency Felling of Large Tall Isolated RCC Columns (Aprox 60mtr Height) of a Commercial Building at     Prestige Shantiniketan Project, Bangalore
  • Dismantling of sinter plant at Durgapur Steel Plant at Durgapur, West Bengal
  • Dismantling of Damaged Pylons at Anegundi side of partially collapsed bridge at Hampi, Hospet
  • Dismantling of old redundant structures in the periphery of KTU, OP feed plant at Indian Oil Corporation Limited, Barauni     Refinery, Begusarai, Bihar
  • Dismantling of Football stadium steps, rakes beams and RCC elements from 83' level to 53' for Karnataka Football     Association, Bangalore
  • Structural Rehabilitation
  • Renovation to Bridge across river Suvarnavathi in the town limit of Yelandur at ch. 946.70 km of Bagalakote – B R Hills     Road for PWP & IWTD
  • Caster I - Civil work of HMO Foundation & BF1 - Restoration of Cooling Tower at Dolvi, Maharashtra
  • Replacing Bearing pads and Strengthening works of exist Major bridges on Khari and Banas river at Udaipur for Sadbhav     Engineering Limited
  • Restoration measures for flood damaged road bridge across Pothnal Nala on SH-23 for KPWD, Raichur
  • Replacement of existing Base Isolators by lifting a three story building at IIT Guwahati
  • Restoration of Damaged Bearing Regions of Bridge girders across scour sluices and head sluices of SACB barrage”,     Dowliswaram, Rajamandri, Government of Andhra Pradesh
  • Protective coating for Mass Rail Transport System Bridge of over 9 kms at Chennai for MTP Southern Railways, Chennai
  • Strengthening of Existing beams with FRP Wrapping CLT at IIT, Chennai
  • Rehabilitation of existing bridge on SH-17, Bangalore- Mysore Road across Arkavati River at 48th Km
  • Rehabilitation of Silos, Civil structures for Mysore cements, Heidelberg Cement Group, Ammasandra
  • Repair and Rehabilitation of Kavery and Kollidam Bridges, NH-45 (Padalur to Trichy)
  • Strengthening measures for fire damaged portion of building of TATA BP Solar India Ltd, Electronic city, Bangalore
  • Retrofitting by 1500 Sqm of wire sawing of foundations, core drilling and anchoring about 20,000.00 holes at JSPL,     Raigarh (C.G.)
  • Water proofing treatment over the roof of various buildings at Engine Division, BEML, Mysore Complex, Mysore
  • Core drilling projects for a few reputed Builder Developer clients like Prestige Group (The Forum Mall), Adarsh Group,     Sobha Group and Mantri Group, Bangalore
  • Protective works to L/B Downstream slope and R/B Hill slope of Supa Dam for Karnataka Power Corporation Ltd,     Ganeshgudi, Karnataka
  • Deteriorated RCC Structures of Berth no. 9” at New Mangalore Port Trust, Mangalore
  • Restoration of Distressed Aqueduct #1, 3 & 4 at Ghataprabha in 25 days against a season-based 45 days deadline
  • MAURITIUS: Waterproofing work at Ebene Village, Mauritius for their prestigious Cyber City project
  • Skype
    :
    Request for Services
    :
    How Can We Help You?
    Email Us
    :
    News Letter
    :
    White Paper
    :
    Download Brochure
    :
    Download Presentation
    :
     
      Copy right 2017 @ Binyas contech Pvt. Ltd., all rights reserved